APA Style
Robbani, F. et al (2023).
Analisis Manajemen Proyek Untuk Memepercepat Waktu Pembangunan Jalan Kereta Api Elevated Dengan Metode Time Cost Trade Off = Project management analysis to accelerate the construction time of elevated railway with time cost trade off method .
Semarang:
Politeknik Negeri Semarang.
MLA Style
Robbani, Falah. et al.
"Analisis Manajemen Proyek Untuk Memepercepat Waktu Pembangunan Jalan Kereta Api Elevated Dengan Metode Time Cost Trade Off = Project management analysis to accelerate the construction time of elevated railway with time cost trade off method".
Semarang:
Politeknik Negeri Semarang,
2023.
SKRIPSI DIGITAL.