SKRIPSI DIGITAL
Analisis Percepatan Waktu Dan Biaya Pada Pembangunan Proyek Apartemen Grandstand Surabaya Dengan Metode Time Cost Trade Off = Analysis of Time and Cost Acceleration in the Construction of the Surabaya Grandstand Apartment Project Using the Time Cost Trade Off Method
ANALISIS PERCEPATAN WAKTU DAN BIAYA PADA PEMBANGUNAN PROYEK APARTEMEN GRANDSTAND SURABAYA DENGAN METODE TIME COST TRADE OFF
No other version available