APA Style
RAMADHANI, M, I. et al (2024).
Analisis Durasi Pelaksanaan Pembangunan Jalan Tol Dengan Metode Earned Schedule
(Studi Kasus: Proyek Pembangunan Jalan Tol Solo – Yogyakarta – NYIA Kulonprogo Seksi II Paket 2.2) = Analysis of the Duration of Toll Road Construction Implementation Using the Earned Schedule Method (Case Study: Solo – Yogyakarta – NYIA Toll Road Construction Project
Kulonprogo Section II Package 2.2) .
Semarang:
Politeknik Negeri Semarang.
MLA Style
RAMADHANI, MOCHAMAD, IQBAL. et al.
"Analisis Durasi Pelaksanaan Pembangunan Jalan Tol Dengan Metode Earned Schedule
(Studi Kasus: Proyek Pembangunan Jalan Tol Solo – Yogyakarta – NYIA Kulonprogo Seksi II Paket 2.2) = Analysis of the Duration of Toll Road Construction Implementation Using the Earned Schedule Method (Case Study: Solo – Yogyakarta – NYIA Toll Road Construction Project
Kulonprogo Section II Package 2.2)".
Semarang:
Politeknik Negeri Semarang,
2024.
SKRIPSI DIGITAL.